S06
S.S. 23 “del Colle del Sestriere” – Alternative route to the town of Porte

Location: Pinerolo, San Secondo di Pinerolo, San Germano, Porte, Villar Perosa
Sole Contractor: Mr. Paolo Platania, engineer
Designers: Studio CORONA Studio di Ingegneria Civile Associazione Professionale - GEODATA Spa - INFRATEC CONSULTING ENGINEERING srl – ITALTEC INGEGNERIA srl - Franco GRASSO, prof. arch. – Geologist: Vincenzo PROCOPIO, eng. - Pietro Rousset, eng.
Cost of work: 65.61 million euros
Work: Work is expected to begin in August 2003
Agenzia Torino 2006image