The new facility is a combined run for bobsleigh, luge and skeleton, artificially refrigerated. It is located in the Pariol Locality, near San Sicario in the Municipality of Cesana Torinese. The facility was designed to satisfy both the needs of high quality sports techniques necessary for an Olympic competition, and to enable new athletes to approach the sports disciplines, as well as for tourist use.
The main data of the course can be summarized in the following points:
Total length: 1,760 m
Length of competition section (bobsleigh):1,435 m
N° of curves:19
Bobsleigh and skeleton starting line:1
Luge starting lines:2
N° of intermediate entrances:3
Height difference:125 m
Area of work:170.000 m2
Maximum speed (bobsleigh with 4):130 Km/h
Maximum acceleration on curve:4.9 g
Time (bobsleigh with 4:)53 s
Average slope:9.2 %
Number of Olympic competition events:8
Olympic event spectators:15,000¸18,000
Altitude of work:1,550¸1,700 m
Several service buildings are located near the track:
The plan subjected to the strategic environmental assessment procedure was developed taking into account post-Olympic requirements as well. In particular, it was integrated with the local situation so as to create an integrated pole: In fact, ski runs from the Via Lattea converge near the facility and are near the intermediate station of the new Cesana-San Sicario cable-car.